A molding, packing and fulfillment plant in Sumter, South Carolina
Injection molding, automation, packaging and an automated warehouse operate under one roof on North Wise Drive.

Factory overview
| Location | 1585 N. Wise Drive, Sumter, SC 29153 |
|---|---|
| Established | Company registered in 2017; plant construction began in 2018; first production in November 2022 |
| Workforce | Approximately 150 employees |
| Injection molding machines | 40+ |
| Plant area | Approximately 150,000 to 250,000 sq ft |
| Core categories | Home organization, tableware, household products |
| Core materials | PP, recycled PP (RPP), PET, PS |
| Warehouse | Automated shuttle storage, 5,000+ pallet positions |
| Current shipments | 200 containers per month, with room to grow |
| On-time, in-full delivery | 98% OTIF |

Equipment overview
| Equipment | Function | Detail |
|---|---|---|
| Injection molding machines | Thermoplastic molding of household and storage parts | 40+ machines, sized for parts from hangers and cutlery to large storage totes |
| Take-out robotics | Part removal and placement onto conveyors | Fitted to molding cells |
| Automatic feeding system | Vacuum conveying of resin to presses | Central hoppers |
| Feeding and mixing units | Blending resin with masterbatch and additives | At-press dosing |
| Process cooling | Mold and machine temperature control | Central system |
| Resin silos | Bulk polypropylene storage | Outdoor silos |
| Dinnerware production line | Molding, take-out and conveying of plates | In-line conveyors |
| Automatic packing machine | Counting and packing high-count items | Automatic counting and packing for cutlery, hangers and other high-count items |
| Brush tufting and flagging | Bristle insertion and tip splitting for brushes | In-house tufting and flagging for brooms and toilet brushes |
| Automated shuttle warehouse | Dense pallet storage and retrieval | 5,000+ pallet positions |
How a typical project runs
01
Product concept
Share the idea, drawings, samples or the retail item you need to source.
02
Engineering review
We review manufacturability: wall thickness, draft, gating and assembly.
03
Material selection
Choose resin, color and recycled content against cost, performance and compliance needs.
04
Tooling
Plan new molds or transfer existing ones. Mold sourcing is confirmed per project.
05
Production
Molding, robotic take-out and assembly in Sumter.
06
Quality verification
Samples and production checks against the agreed specification.
07
Packaging and delivery
Retail-ready packing, labeling, warehousing and shipment.
Expansion and modernization
Completed
Automated warehouse
Shuttle storage with 5,000+ pallet positions.
Planned 2026–2027
Automation and new lines
New automated lines for high-demand categories.
In development
Recycled content
Scale recycled resins such as RPP and RPET.
In development
Local supplier base
Build a local supplier base for recycled raw materials.
Planned
Product design team
Invest in U.S. product design talent.
Planned
Floor space
Grow from about 150,000 sq ft toward a planned 500,000 sq ft over 12–60 months.
Plans are forward-looking and may change.
Inside the plant
Plan a visit or a production trial
See the molding floor, review samples and talk through your program with our team.